P6 set the standard. Planera is raising it.

A modern, AI-native CPM platform built for the complexity of construction, without being complicated.

Request a demo

Trusted by top builders
Stacy Witbeck logoBarton Malow logoBig D construction logoHITT logoBalfour Beatty logoRyan companies logoGarney Construction logoSwinerton logoAlridge logoHensel Phelps logoButz family of companies logo
Stacy Witbeck logoBarton Malow logoBig D construction logoHITT logoBalfour Beatty logoRyan companies logoGarney Construction logoSwinerton logoAlridge logoHensel Phelps logoButz family of companies logo
Stacy Witbeck logoBarton Malow logoBig D construction logoHITT logoBalfour Beatty logoRyan companies logoGarney Construction logoSwinerton logoAlridge logoHensel Phelps logoButz family of companies logo

What modern construction scheduling looks like.

Modern construction scheduling brings CPM rigor and the people who use it into the same platform, not a stack of separate tools around the schedule.

Modern CPM with Planera

Full CPM logic

Office + field in one place

Built-in AI quality validation, & risk detection

Easy to learn, fast to adopt

Real-time collaboration across teams

Traditional Scheduling Tools

Built for schedulers, not the field

Static schedules

No built-in AI, quality check, or risk detection

Steep learning curve, slow onboarding

Siloed data, limited collaboration

Construction is complex.
Your scheduling platform shouldn't be.

Planera's CPM software supports complex construction projects

Bring the work around scheduling back into the schedule.

With P6 and other legacy scheduling software, dashboards, risk analysis, quality tracking, and collaborative field planning often live outside the schedule.

In Planera, quality checks, schedule intelligence, AI, dashboards, and detailed field planning are built into the way you schedule.

AI that knows your schedule

Manny works directly from the CPM data already in the schedule. It helps teams surface risk, model what-if scenarios, and identify potential recovery options that schedulers can check against the logic they already trust.

Manny doesn't override anyone's judgment or change the schedule on its own. It gives teams more time to make the decisions that move projects forward.
Progress updates in Planera
Planera Cloud Platform

Built around the team

Legacy scheduling was built around the schedule. Modern scheduling is built around the team.

Planera is visual and intuitive enough to bring everyone in, from the field to the office to the executive team, while keeping the CPM rigor schedulers rely on.

Every level of the schedule, connected

When master schedules, look-aheads, and pull plans are disconnected, teams spend time reconciling different versions of the plan, and problems surface too late.

Planera keeps master schedules and detailed field plans connected, so teams can see what's changing while maintaining full control over what makes it into the schedule.
Planera Cloud Platform

Construction scheduling software FAQs

Clear answers about Planera, CPM scheduling software, P6 alternatives, AI scheduling, and connected field planning.

What is Planera?

Planera is modern, AI-native CPM construction scheduling software built for general contractors and the teams that plan and deliver complex construction projects. Planera combines CPM scheduling, field planning, schedule intelligence, quality checks, dashboards, and AI in one connected platform.

Is Planera an alternative to Primavera P6?

Yes. Planera is a P6 alternative that combines rigorous CPM scheduling with a visual, collaborative interface built for construction teams. Schedulers, project managers, superintendents, trade partners, and executives can work from the same plan instead of relying on separate spreadsheets, whiteboards, and side documents.

How is Planera different from P6 and Oracle Primavera Cloud?

Planera differentiates itself from P6 and Oracle Primavera Cloud by keeping CPM scheduling, field planning, quality checks, dashboards, and AI in one connected platform, instead of a set of separate tools stacked around the schedule. Planera is designed to handle complex construction schedules without making the software complicated for the wider project team.

Is Planera CPM scheduling software?

Yes. Planera is CPM scheduling software that supports predecessor and successor relationships, multiple calendars, constraints, lag and lead, float calculations, and critical-path analysis. Teams get the CPM rigor required for complex projects in a visual, intuitive platform.

Does Planera's AI change the construction schedule automatically?

No. Manny does not override the scheduler's judgment or change the construction schedule on its own. Manny surfaces analysis and potential options from the schedule's CPM logic so the scheduler can evaluate them and remain in control of every decision.

P6 set the standard.
See what raising it looks like.

See how Planera handles CPM scheduling without the complexity.