Electrical contractors

Scheduling software for electrical contractors

The GC owns the master schedule. Your crews absorb every change. Build your own CPM schedule and plan labor before the next Milestone moves.

Switch versions or hover a bar

Data Hall 2Electrical schedule
GC baseline
Planera electrical schedule for Data Hall 2. The GC moved Energize switchgear from WK 18 to WK 17, compressing Pull MV feeders by 4 days and Terminate + megger test by 2 days.

Trusted by electrical contractors and the GCs they build for

Where the labor goes

Labor overruns rarely come from one big miss

They come from dozens of small schedule changes nobody quantified in time. By the time the impact shows up in the labor report, the hours are already spent.

Scattered copies of the GC’s schedule in different versions and formats: Springfield-Data-Campus V3-1.xlsx, V3.pdf, V3-2.xlsx, V4.pdf and V3-4.xml

Your durations compress quietly

The three-week lLookahead you got last Tuesday is already out of date, and someone is comparing PDFs line by line to find out what changed.

Planera labor tooltip for Mar 27: Project 1 at 8 hours, with Superintendent 2 hours, Laborer 2 hours and Foreman flagged with a warning at 4 hours

Headcount changes nobody upstream sees

Crew sizes shift on site to keep up. Operations finds out when the job is already over on hours.

A master schedule and a field schedule side by side, with a broken link between them

Field plans disconnected from the schedule

Foremen plan in Excel and on whiteboards, and none of it makes it back into the schedule that is supposed to drive the work.

Your schedule

Your schedule, built around the GC’s

Import the GC’s P6 or Microsoft Project file, pull the Milestones that drive your scope, and build your own detailed CPM schedule underneath them. Your logic, your durations, your crews. When the GC asks for an update, send it back as an XER.

  • Imports XER, XML and MPP files
  • Built-in DCMA 14-point quality check
  • Designed for teams without a P6 expert
Planera project card for Springfield Highway Bridge, Version 1.5, imported from P6, showing the data date, a Start Progress Update button and a 336-day date range at 40% complete, over a photo of a cable-stayed bridge
Manpower

Staff the job before the peak hits

Load Activities by headcount, down to partial crews. The resource view shows the peaks and valleys in manpower across your active projects, and you can click into a spike to see which Activities are driving it.

When the GC moves a Milestone, you see the crew impact weeks ahead, not when it’s too late.

Planera Resource Planning chart of monthly labor hours from January 2026 to February 2027, with August and September above the capacity line highlighted in orange, over an aerial photo of a construction site
Change

Prove the time, not just the dollars

Electrical contractors track change orders to the dollar and often leave the schedule impact on the table. Compare any two versions of the schedule side by side to show exactly what the GC moved, which of your Activities it pushed, and how much float you lost.

Then make the case for the time extension with the schedule in hand, not a marked-up PDF.

Planera Compare Versions panel comparing This Version (V.102) with Permit Update (V.206), with an Export Comparison to Excel button, above a Gantt chart showing the shifted activities in orange, over a photo of a steel-framed roof
Manny, AI scheduling assistant

Find the recovery plan before the overtime starts

When the GC squeezes your window, Manny works through your CPM logic to show what’s driving the crunch and surfaces recovery options, like resequencing work, overlapping Activities or adding a crew. Test each one against the schedule before you commit labor. Your team makes the call.

“Manny is like having an expert sitting next to you who can explain exactly why your schedule is behaving the way it is.”

Damon Toivonen, Mill Plain Electric

Manny, the AI scheduling assistant, answering why terminations moved onto the critical path: the GC pulled Energize switchgear in by 6 days, removing the float on Pull MV feeders and Terminate + megger test, with two recovery options and a Create new version button, over an aerial photo of an industrial park
Who uses it

Built for every role

Project managers

Own the schedule for your scope without waiting on a scheduler to make every change.

General foremen and superintendents

Build lookaheads from the real schedule and see what your crew needs next week, on desktop or iPad.

Operations leaders

See manpower demand across projects before you commit crews to the next job.

Estimators and schedulers

Spend less time copying GC dates out of PDFs and more time on what the changes cost.

“

On fast-tracked hyperscale electrical installations, our crews need clear alignment with the Master Schedule every single day. Planera takes the complexity out of CPM scheduling.

Alec HoffmanLead Estimator, Aldridge Electric

Getting started

Making the switch is easy

1

Bring in the GC’s schedule

Import XER, XML or MPP files with activity codes, relationships and calendars intact.

2

Load your crews

Build your Activities under the Milestones that matter and assign headcount to each one.

3

Put it in front of the field

PMs and foremen plan from the same schedule, with full control over what makes it into the official version.

Frequently asked questions

What is the best scheduling software for electrical contractors?

Planera is a CPM scheduling platform that electrical contractors use to build their own schedules around the GC’s Milestones, load crews by headcount, and see how schedule changes affect labor. It’s built for teams that don’t have a dedicated P6 expert.

Yes. Planera imports XER, XML and MPP files and keeps activity codes, relationships and calendars.

Yes. Export your schedule as an XER or MPP file whenever the GC or owner asks for an update.

No. PMs and general foremen build and update schedules directly, and the built-in DCMA 14-point check keeps schedule quality in view. Teams that do have a scheduler spend less time on admin and more on analysis.

Yes. Assign headcount to Activities, including partial crews, and see manpower peaks and valleys across your active projects.

Yes. Electrical contractors use Planera on hyperscale data center work, where GC Milestones move often and crews need daily alignment with the Master Schedule. See data center scheduling.

Raise the standard for electrical scheduling

See why electrical contractors on fast-tracked, high-stakes work run their schedules in Planera.