What's new in Planera: August 2026

This month's release is about staying in the flow of your work: progress updates that finish faster, logic repairs that happen right where you spot the issue, context that lives where the work does, and Manny picking up more of the analysis once your update is done.

Faster and more intuitive progress updates

Statusing a schedule is one of the most important flows in Planera. The redesigned progress update side panel queues up every activity that needs an update based on your data date and puts all the inputs in one place: status, actual start, remaining duration (or expected finish, if that's how you work), variance reasons, and notes. Confirm an update and the activity clears from your list, so you can work straight down to inbox zero, entirely from the keyboard if you prefer.

Watch how it works

Deeper insights into the impact of progress updates with Manny

You work through your progress-update list, resolve the last activity, and the real question starts: what did all of that do to the schedule? Now, when the progress-update list is clear, Planera offers to run insights with Manny: check off the preset analyses you want, a milestone analysis, a compression summary, a changes report, a blockers review, and each opens in its own chat thread with the prompt and Manny's response together. On a project you update weekly, that turns "what moved?" into something you actually do every time.

Watch how it works

Variance comparison against any version

The version you need to compare against isn't always the baseline or the previous update; sometimes it's a resequenced plan from three versions back. Variance columns now work against any version in your project: open the variance columns, click Change, choose the version, and pull in start, finish, and float variances against it, with up to two alternative versions at once.

Watch how it works

Add site photos, markups, and screenshots in your notes

When you encounter an issue during construction, a photo captures the situation better than any written description. You can now embed images directly in activity notes: insert from the note, drag and drop, or copy and paste, and the visual context lives right alongside the written record on the activity.

See it in action

More powerful multi-project resource planning

Whether crews can move between jobs or must stay dedicated to one changes the answer to "how many people do I need?" The resource planning dashboard now lets you view labor and equipment as shared, the maximum in use at any one time across projects, or dedicated, the total needed over the period, with per-project maximums and cumulative sums in the table below. One view answers both peak demand and total need for any set of projects.

Watch how it works

Repair logic while inspecting path for higher quality schedules

Inspect path is where you trace what's driving a milestone, and it's often where you find the tie that's missing. Now you can fix it without leaving: right-click any activity in the path, add a predecessor or successor, pick the activity by name or ID, set the relationship type and lag, and the change flows back to the table and Gantt.

See it in action

Your organization's best prompts, on every project

When several teams across your organization leverage Manny, the payoff depends on all of them asking the same well-built questions, and that is hard to standardize from one project and one team to the next. Org admins now get an editable Prompt Library: in the new Manny section on the Home screen. From here you create and edit the organization-wide prompts that appear on every project, each with a name, a one-line description, and a category you define. From any project, your team opens Manny, browses the library, runs a prompt, and pins the ones they use most to the top, alongside a personal selection of their own.

Watch how it works

‍

Resources for modern 
construction professionals

See all posts →

Product Updates

Planera Is Bringing Construction Schedules to Claude and ChatGPT

Read More

Articles

Sticking with P6 Isn’t Risk-Averse. It’s Reckless.

Read More

Product Updates

‍Planera and Procore Connect RFIs to the CPM Schedule with New Schedule Risk Scanner Agent

Read More

Planera Is Bringing Construction Schedules to Claude and ChatGPT
Sticking with P6 Isn’t Risk-Averse. It’s Reckless.
‍Planera and Procore Connect RFIs to the CPM Schedule with New Schedule Risk Scanner Agent
Beyond P6: The Cost of Standing Still
P6 Set the Standard. We're Raising It.
Planera Accelerates Data Center Momentum as Hyperscale AI Boom Overwhelms Legacy Construction Scheduling Tools
What Is Percent Plan Complete in Construction and How Does It Work?
How to Build a Reliable Weekly Work Plan for a Construction Project
What's new in Planera: October 2026
Why Data Center Construction Projects Fall Behind Schedule and Delays Happen
A Step-by-Step Guide on How to Update a Construction CPM Schedule
Why Near-Critical Paths Matter in Construction Project Scheduling
How to Build a Resource-Loaded Construction Schedule: Complete Guide
De-Risk the Supply Chain, Keep Procurement on the Critical Path
Protecting the Pro Forma: Why Owners Need Direct Eyes on the Capital Improvement Schedule
The Complete Guide to Data Center Construction From Planning to Turnover
How Long Does Data Center Construction Take? Timeline, Phases, and Challenges
AI Agents for Construction: Use Cases, Benefits and Examples
6 Best AI Construction Scheduling Tools in 2026
Legacy Tools 
Weren’t Built
for Data Center Construction
Planera Names Stephen Archibald Chief Financial Officer
Planera Brings One-Click Schedule Sync to Autodesk Forma
How to Use AI in Construction: Practical Use Cases for Construction Teams
What's New in September
Five Takeaways from the Built for the AI Boom: Data Center Webinar
How to Conduct Delay Analysis for Construction Projects: Methods, Claims and Best Practices
De-Risking the Supply Chain: How Visual Sequencing Keeps Long-Lead Procurement on the Critical Path
What's New in Planera: July 2026
How to Develop a Commercial Construction Project Schedule
What's new in Planera: August 2026
How Construction Schedule of Values Helps Manage Project Costs and Payments
Construction Firms Face Autumn Microsoft Project Retirement Deadline
The Scheduler's Playbook
The Blueprint for Project Success: Why Collaborative Planning and AI are Redefining Construction Scheduling
How Construction Schedule Levels Improve Project Planning and Execution
Moving Beyond the Gantt Chart
Flipping the Construction Profit Equation
Making Schedules Accessible
How to Create a Construction Master Schedule and Manage a Project Timeline Successfully
Every Project You've Ever Seen Run Late Was Scheduled on Software from 2007
Construction Milestone Schedule: How to Plan Key Project Dates and Keep Projects on Track
The High Cost of Inaction: Why Sticking with Legacy Scheduling is Eroding Contractor Margins
What's new in Planera (June 2026): schedule changes with Manny, searchable notes, and more
Construction Fast Tracking: What It Is, When to Use It, and What Can Go Wrong
Lean Construction Scheduling: Principles, Techniques, and Benefits
Pull Planning in Construction: Process, Benefits, and Examples
Construction Sequence Plan: How to Sequence Work for Better Project Flow
9 Best Touchplan Alternatives for Construction Project Management in 2026
9 Best Outbuild Alternatives for Construction Project Management in 2026
Critical Path Method (CPM) in Construction: A Full Guide
What's New in Planera: May 2026
The Best Procore Alternatives for Construction Scheduling
Moving From
Legacy Tools to Modern CPM, the Complete Guide for Modern Construction Teams
Elevating Construction Success: The Planera Support Advantage
The Shift from Oracle P6 to Planera: Why Leading Contractors are Choosing Collaborative Scheduling
Lookahead Scheduling in Construction: How to Plan Without Slowing the Job Down
New AI Agent Changes Construction Scheduling..Are Schedulers Now Redundant?
Construction Scheduling 101: Complete How-to Guide for Project Managers [2026]
What's New in Planera: April 2026
Planera Releases AI Schedule Assistant; DPR Rolls Out ConstructivIQ on 120+ Projects
Planera Launches Manny, Turning Construction Schedules Into Live Decision Engines
Scheduling Without a Data Date Is Not Just Bad Practice, It's a Liability
Best Microsoft Project Alternatives in 2026 (Top Tools Compared)
July Product Updates: Better bulk actions, Hide collaborator cursors & more
August Product Updates: Four new features + a speed boost you’ll love
September Product Updates: Smarter Permissions, Sharper Insights, Richer Context
October Product Updates: New sorting for P6 imports, flexible IMS, edit-in-Gantt, and more
November Product Updates: Clearer navigation, smarter safeguards, and smoother interactions
December Product Updates: update schedules with confidence, investigate issues faster, and avoid cleanup work
Top 10 Oracle Primavera P6 Alternatives & Competitors for The Construction Industry in 2026
The MS Project Retirement: Why Construction Leaders are Securing Their Future with Planera
February 2026 Product Marketing Update
How to Read and Use a Gantt Chart for Construction Scheduling
Best Construction Workflow Management Software Picked for 2026
11 Best CPM Software of 2026 for Your Construction Project
Building Data Centers Faster and Smarter: Visual, Collaborative Scheduling Isn’t Just an Option—It’s a Business Mandate.
How Big-D Construction uses Planera to avoid ‘death by 1,000 paper cuts’
The Future of Construction Scheduling for GCs to Improve with AI using Planera
13 Best Construction Management Software Platforms to Compare in 2026
From Trailer to Tablet: Making Schedules Work Where the Work Happens
12 Digital Construction Tools Every Contractor Needs in 2026
50 Best Construction Scheduling Software Platforms in 2026
Change Leader: Why Infrastructure Projects Lose Margin Before They Break Ground
Planera Adds Industry Leaders Matt Burness and Mark Baracani to Strengthen Product and Construction Expertise
Planera Expands Data Centre Presence with New Funding
‍Planera Accelerates Data Center Expansion, Raises $8M in New Funding
Miles-McClellan Expands Scheduling with Planera for iPad
Planera September Update: Smarter Permissions, Sharper Insights, Richer Context
AMLI Residential Selects Planera to Transform Project Scheduling and Field Collaboration
The Future is Hybrid: Why Modern Construction Demands both CPM and Lean
The Evolution of Construction Scheduling in the Design-Build Era
Planera Featured on the Art of Construction Podcast
Report: Legacy Tools & Hiring Top Concerns Amid Construction Boom
Sticky Notes Don’t Scale: 5 Reasons to Choose Logic-Driven Scheduling
Drill Tech Selects Planera for Schedule-Critical Tunnel Projects
Scheduling That Keeps Up with Data Center Demands
Bridging the Skills Gap: PlaneraEDU Prepares Digital Jobsite Pros
Watch the Webinar! Planera Field Schedules Linked to Master Plan
Planera Wins 2025 Gold Globee® Award for Disruptors
Planera Launches Collaborative Field Scheduling for Teams