From Sidelined to Center Stage: How Planera Helped HITT Transform Field Scheduling

By replacing siloed tools like P6 with a real-time, user-friendly platform, HITT gained earlier visibility into delays, tighter trade coordination, and improved accountability across massive project scopes.

Statistic

Statistic

Statistic

The Challenge

Massive data center builds demand meticulous coordination across dozens of trades. But traditional scheduling tools like Primavera P6 or Microsoft Project kept superintendents and subcontractors on the sidelines. “Our field folks are the ones doing the work,” says Von Krosigk. “But they were stuck pulling three-week lookaheads from a P6 file built by a third-party scheduler.”

Without real-time insights into task delays or scope shifts, issues often surfaced too late:

“You don’t know that you’re behind until it’s too late.”

The Solution: Planera

By rolling out Planera across job sites, HITT gave project leaders and subcontractors a shared platform to build, adjust, and own their schedules—right down to the row-level in a data hall.

“It puts scheduling back in the hands of the guys that are actually building the work.”

The result? Micro-schedules for trenching, hall buildouts, and trade coordination are now built collaboratively and tied directly to the master plan.

“Instead of everyone using their own Excel or sticky-note systems, Planera puts it all in one space. Each team gets their own schedule space, and it all pipes back to the master.”

Todd Von Krosigk
Senior Superintendent

The Impact

Planera helped HITT’s teams:

  • Detect schedule slips days earlier
  • Increase subcontractor accountability through transparent planning
  • Track real-time variance data across months-long projects
  • Maintain clearer client communication and reporting

“It tells the story—what really happened—and not just for us. The subs get to do that as well.”

“If you’re 20 days into a 30-day task and not a quarter of the way through, Planera lets you catch it and course correct—early.”

Todd Von Krosigk
Senior Superintendent

Why It Works

Von Krosigk credits Planera’s ease of use and ability to tie back to P6 as key differentiators:

“You don’t need a master’s in P6 to use it. You can break ties, adjust logic, and still pull out clean six-week lookaheads for your client.”

“It takes work to get it to work—but once you get buy-in, it changes the game.”

About

HITT Contracting

Company Size
1,000+
Planera Projects

You deserve better scheduling software.

Request a Demo

More Customer Stories

Miles-McClellan Reduces Scheduling Friction and Unifies their Teams

Read More

From Siloes to Seamless: Landmark Excavating Transforms Scheduling


Read More

LINC used Planera to Boost Efficiency and Precision in Construction Scheduling

Read More

Big-D Construction Improves Profitability, Collaboration, and Scheduling Efficiency

Read More

How CEC Uses Planera to Optimize a very complex Folsom Dam Construction Plan

Read More

Boosting Efficiency and Precision in Construction Scheduling with Planera

Read More

Castle Rock's Scheduling Breakthrough with Planera

Read More

From Sidelined to Center Stage: How Planera Helped HITT Transform Field Scheduling

Read More

Planera is the better way to schedule
Powerful can be easy. Book a demo to see how.
Book a Demo