CEC Streamlines Complex Infrastructure Rehabilitation and Scales Collaboration with Planera

How CEC replaced legacy scheduling complexity with Planera's visual CPM platform on the Mare Island Lift Bridge project

Statistic

Statistic

Statistic

The Challenge: Complex Infrastructure Work Demands Accessible Scheduling

‍

California Engineering Contractors (CEC) took on an intricate multi-phase maintenance and retrofit project for the City of Vallejo on the historic Mare Island Lift Bridge. Originally constructed in the late 1930s and converted to a counterweight lift span in the 1970s, the bridge serves as a vital artery over the Mare Island Strait (the mouth of the Napa River), raising and lowering up to 20 times per day to accommodate marine traffic.

‍

The scope of work required an intricate mix of disciplines—including full repainting of above-deck steel and the lift span, deck repaving, concrete structural repairs, fender replacements, pile replacement, and anode installations on the towers' sub-structure.

‍

To comply with the project's Caltrans specifications, CEC needed to submit rigorous logic-based Critical Path Method (CPM) schedules, monthly updates, and Time Impact Analyses (TIAs). Historically, meeting these requirements meant turning to legacy software like Primavera P6. However, P6’s steep learning curve often limited active schedule building and updating to specialized schedule experts, effectively treating scheduling as an isolated "dark art" removed from the broader project team.

‍

The Solution: Bringing Visual Collaboration and Modern Tools to the Schedule

‍

CEC turned to Planera to manage the Mare Island Lift Bridge project from baseline creation through ongoing field execution. Planera provided CEC with a modern, intuitive visual interface while remaining fully compliant with Caltrans CPM standards, logic relationships, and required export formats (such as XLS, PDF, and detailed narratives).

‍

Key elements of CEC’s implementation include:

  • Visual Drag-and-Drop Canvas: Allowing non-expert users and newcomers to intuitively map out timelines, sequence activities, and evaluate delay impacts without navigating cumbersome legacy menus.
  • Democratized Access: Expanding schedule visibility beyond specialized schedulers to project managers, field engineers, and superintendents using mobile and iPad interfaces.
  • Integrated Field Look-Aheads: Leveraging automated features to generate 3-week look-ahead schedules directly from the master CPM schedule—eliminating manual Excel workaround tracking.

The Results: Streamlined Workflows, Better Insights, and Field-Level Impact

‍

By adopting Planera, CEC has transformed scheduling from an isolated task into a collaborative project asset.

‍

1. Faster Onboarding & Lower Learning Curve

Unlike legacy software that requires extensive classroom training, Planera enabled team members to dive in and actively contribute right away.

‍

"The biggest thing is honestly the ease of use of Planera for newcomers to scheduling. P6 has a pretty steep learning curve, but as long as you can understand the basics of scheduling, you could ask somebody pretty novice to go into Planera and create a schedule." — Jonathan Tadros, Project Manager, CEC

‍

2. Intuitive Canvas and Better Workflow

The visual nature of the platform made tracking critical path impact activities and baseline adjustments straightforward for the entire team.

‍

"In terms of the workflow and the tools, it seems a little more straightforward and easy. The Canvas is sort of drag and drop and is fantastic." — Chris Mosser, Project Team Member, CEC

‍

3. Bridging Field Experience with Modern Technology

As construction technology evolves, Planera provides the bridge between field expertise and CPM logic—making it practical to push detailed crew-level look-aheads directly to trade teams in the field.

"I see the potential that Planera can end up with the best of both worlds—to make an easier, more accessible version for people who don't aspire to be schedule experts, but to leverage and take advantage of the power and logic of a critical path schedule."

Robert Ikenberry,
Coatings Manager, CEC

About

Company Size
Project Type

You deserve better scheduling software.

Request a Demo

More Customer Stories

Miles-McClellan Reduces Scheduling Friction and Unifies their Teams

Read More

From Siloes to Seamless: Landmark Excavating Transforms Scheduling


Read More

LINC used Planera to Boost Efficiency and Precision in Construction Scheduling

Read More

Big-D Construction Improves Profitability, Collaboration, and Scheduling Efficiency

Read More

How CEC Uses Planera to Optimize a very complex Folsom Dam Construction Plan

Read More

Boosting Efficiency and Precision in Construction Scheduling with Planera

Read More

Castle Rock's Scheduling Breakthrough with Planera

Read More

Drill Tech Delivers Schedule-Critical Tunnel Projects with Planera

Read More

Rimrock Construction Brings Projects Back on Track with Planera

Read More

Miles-McClellan Improves Field Scheduling with Planera on iPad

Read More

AMLI Residential Ditches MS Project for Planera

Read More

How Paulsen Construction Transformed Scheduling with Planera

Read More

Zachry Construction Uses Planera to Optimize Resource Scheduling

Read More

How Cal Wadsworth Construction Made Scheduling a Team Skill

Read More

Silverado Streamlines Pre-Construction Scheduling with Planera

Read More

Charcoalblue Bridges Creative and Construction with Planera

Read More

Why Balfour Beatty Chose Planera Over P6

Read More

Timberlake Accelerates Collaborative Scheduling and Pre-Construction with Planera

Read More

CaseCo Streamlines Pre-Construction Scheduling and Scales Operations with Planera

Read More

How Garney Construction empowers field teams with a scheduling platform built for the people running the work

Read More

How CEC replaced legacy scheduling complexity with Planera's visual CPM platform on the Mare Island Lift Bridge project

Read More

Planera is the better way to schedule
Powerful can be easy. Book a demo to see how.
Book a Demo
construction scheduling dashboard