Matt Burness

Head of Product

Matt Burness is Planera's Head of Product, leading the roadmap for modern construction scheduling. He works closely with executives, project teams, and schedulers to build high-impact solutions for successful project outcomes.

You deserve better scheduling software.

Drive revenue, reduce costs, and manage scheduling with Planera.
Button

Articles by

Matt Burness

Scheduling

eBooks

Flipping the Construction Profit Equation

Read More

Scheduling

Articles

Making Schedules Accessible

Heavy civil construction operates on a massive and often unforgiving scale. Whether tunneling through solid rock, retrofitting an operational dam, or managing miles of active highway paving, the logistics are complex. Schedules for these projects are dense, highly technical, and frequently carry thousands of individual line items. Historically, understanding, analyzing, and manipulating these schedules has been the exclusive domain of highly trained specialists in the back office.

But keeping schedule analysis locked away from the field is a costly operational mistake.

The project schedule should act as the heartbeat of a job — a living, breathing rhythm that guides daily execution. When a schedule is treated merely as an episodic reporting requirement, isolated from the superintendents and trades actually putting the work in place, projects suffer from what we’ve termed "decision latency."

Without accessible schedule data, field leaders are forced to make rapid, instinct-based decisions when unexpected changes occur. If a subcontractor arrives with a smaller crew than expected, a superintendent will adjust on the fly to keep people moving. However, without a clear view of the underlying critical path method (CPM) physics, they cannot see the downstream compounding impacts of that choice.

These gut-based field decisions act as a series of operational paper cuts. Over time, they compound, resulting in hidden schedule compression that typically rears its head in the final 90 days of a project. To recover, contractors are forced into expensive overtime, stacked trades, and heightened safety risks.

To cut out this decision latency, contractors must open up schedule analysis to everyone. Making project timelines accessible and understandable across the entire team requires more than just buying new software; it requires fundamental shifts in project culture, planning workflows, and field engagement.

Read More

construction master schedule banner

Scheduling

Articles

How to Create a Construction Master Schedule and Manage a Project Timeline Successfully

Read More

Scheduling

Articles

Every Project You've Ever Seen Run Late Was Scheduled on Software from 2007

Walk onto any major construction site and you're surrounded by invisible coordination. A concrete pour can't happen until rebar is inspected. Mechanical equipment can't be set until structural steel is up. Electrical rough-in can't start until framing is done. None of this coordination happens by instinct. A project scheduler built a master schedule. A superintendent converted it into a weekly plan. A project controls engineer is tracking progress and trying to figure out why the project is already two weeks behind.

‍

Behind every hospital, data center, highway interchange, and office tower is a chain of schedulers, planners, and project controls engineers you've never heard of, doing work you've never thought about, in a $2+ trillion US industry that software has largely failed.

‍

They're all still running on a tool whose architecture hasn't meaningfully changed since 2007.

‍

Read More

construction milestone schedule bannerconstruction milestone schedule banner

Scheduling

Articles

Construction Milestone Schedule: How to Plan Key Project Dates and Keep Projects on Track

Read More

Scheduling

Articles

The High Cost of Inaction: Why Sticking with Legacy Scheduling is Eroding Contractor Margins

In the construction software industry, the biggest competitor is rarely another technology platform; it is the status quo. For general contractors (GCs), the decision to do nothing and stick with legacy scheduling tools like Oracle Primavera P6 or Microsoft Project feels like the safe, easy path. However, this inaction carries an immense, quantifiable financial toll.

‍

Rather than focusing merely on software features, executives must confront the actual business impact of relying on outdated scheduling methods. From unconstructible baseline schedules and hidden delays to severe resource bottlenecks and expensive litigation, the "old way" of doing things is quietly draining profitability. The solution lies in transitioning to a modern, visual, collaborative Critical Path Method (CPM) platform like Planera, which eliminates the friction of legacy systems and transforms the schedule into a dynamic driver of project success.

‍

Here is an in-depth look at the high costs of inaction that general contractors incur every day.

‍

Read More