P6 Set the Standard. We're Raising It.

Primavera P6 defined construction scheduling for nearly three decades. Here's who Planera is, what modern scheduling looks like, and why it's time to raise the standard.

Oracle calls Primavera P6 "the standard for planning and scheduling." For most of the last three decades, that was fair. P6 gave construction a rigorous way to model how a project gets built: activities, durations, relationships, and a critical path you could defend in a claim. Nearly every serious scheduler learned on it.

Nearly every other part of the job has raised its bar since P6 arrived. Projects got bigger, faster, and more tightly sequenced. Owners stopped accepting a monthly PDF as a status update. Safety and quality programs that were optional in the '90s are now the bare minimum.

Scheduling needs more than a revision. It needs a new standard. Projects carry far more complexity than they did when P6 was designed, more of the team needs to work from the schedule, and AI can now reason over CPM data directly. The new standard should account for all three.

Yet most contractors are still scheduling like it's 1998. That gap used to be an inconvenience. Now it's a competitive liability, and it gets wider every quarter a team decides to wait.

Who we are

Planera is a modern, AI-native CPM platform built for general contractors running complex, high-stakes work. We kept everything that makes CPM rigorous: logic, critical path, float. What we changed is who gets to use it.

P6 was built around one job title. Planera is built for the whole team that has to build, update, and act on the schedule: schedulers, PMs, superintendents, and the executives who need to know where every project stands.

The new standard for construction scheduling

Here are five things every GC should expect from its scheduling software today. If your current setup can't do them, it's holding your projects back.

1. AI that actually knows your schedule

Most scheduling questions take hours to answer because someone has to dig through the schedule to find the answer. What's driving the critical path? Which activities are missing logic? What happens to the finish date if steel slips two weeks?

In Planera, you ask. Manny, Planera's AI scheduling assistant, reads the schedule the way a senior scheduler does and answers in seconds. Manny flags missing logic, open-ended activities, and shrinking float before they become bigger problems, and drafts reports in minutes instead of a day. Your schedulers still make the calls. They just stop spending their week hunting for answers.

2. See the impact of every change, right away

Schedule-quality benchmarks commonly look for 1.5 to 2 logic ties per activity. On a routine $20 million commercial job, that already means hundreds of interdependencies. Stretch it across a $500 million data center or hospital program and the network gets too dense for any one person to hold in their head. P6 can still calculate it. The trouble is everything around the calculation: who can read it, who can update it, and how fast anyone can ask it a question.

In Planera, the impact shows up as you make the change: what's now on the critical path, how much float is left, where the finish date lands. The what-if happens in the meeting, not a week after it.

3. Collaboration without giving up control

Legacy scheduling forced a choice: lock the schedule down so only trained schedulers could touch it, or let everyone in and watch the logic fall apart. Most teams chose the lock, so the field ran the work from Excel trackers and whiteboards instead.

Planera removes the tradeoff. PMs, supers, and trade partners plan their work in the same platform, and schedulers still maintain control. Everyone contributes, and the schedule stays defensible.

"By democratizing scheduling this way, Planera has helped us to make our schedules more accurate and more efficient."
— Troy S. Thompson, COO, Big-D Construction

‍

4. Field schedules and the master schedule, in one place

Supers need a detailed, week-by-week plan. Schedulers need a master schedule that stays clean and defensible. Those should be separate plans. They shouldn't live in separate tools.

On most P6 jobs, the field plan lives in a spreadsheet or on a whiteboard, invisible to anyone outside the trailer. In Planera, field schedules sit in the same platform as the master schedule. The field plans the work in detail, the office sees all of it, and schedulers decide what makes it into the master.

"It puts scheduling back in the hands of the guys that are actually building the work."
— Todd Von Krosigk, Senior Superintendent, HITT Contracting

‍

5. One platform, not a pile of disconnected tools

Around most P6 schedules sits a patchwork of other software: one tool for dashboards, another for risk analysis, another for quality checks, another for pull planning. None of them talk to each other well, so every answer starts with exporting, re-entering, and reconciling.

Planera puts AI, dashboards, risk simulation, DCMA-14 quality checks, and pull planning in one platform, all working from the same schedule. When an owner asks about a milestone, the answer comes from the schedule, not from whichever export went out last.

What the status quo costs

Nearly everything about how construction gets delivered has changed since P6 arrived: BIM, prefab, reality capture. The way most teams schedule has not.

Every week a senior scheduler spends re-keying updates is a week not spent on recovery plans and risk reviews. Every look-ahead rebuilt by hand is a plan that's already stale. Every question that waits for the monthly update is a problem found a month late. Across a portfolio, the status quo is costing you millions. Big-D Construction rolled Planera out across 30+ active projects and saw more than $1.5 million in ROI in the first year. They've since moved the majority of their projects to Planera.

Wait and see feels safe, but it's a risky decision to watch the builders who move first get faster, more accurate, and more competitive while you're still exporting PDFs. Five years from now, the GCs still scheduling like it's 1998 won't look careful. They'll look slow.

And the contractors making the move aren't small shops. ENR Top 400 contractors like Balfour Beatty chose Planera over P6.

"Planera has given us a faster, more transparent way to manage complex schedules. The buy-in from our team has been incredible."
— Travis McGarraugh, Special Projects Group, Balfour Beatty

‍

If Oracle is pushing your team to move to Oracle Primavera Cloud, you're already signing up for a migration and a retraining effort. Make that move count. Hold whatever comes next to the new standard, not the old one.

P6 set the standard. Planera is raising it.

See what modern construction scheduling can do. Book a demo.

Resources for modern 
construction professionals

See all posts →

Product Updates

‍Planera and Procore Connect RFIs to the CPM Schedule with New Schedule Risk Scanner Agent

Read More

eBooks

Beyond P6: The Cost of Standing Still

Read More

Company Announcements

Planera Accelerates Data Center Momentum as Hyperscale AI Boom Overwhelms Legacy Construction Scheduling Tools

Read More

‍Planera and Procore Connect RFIs to the CPM Schedule with New Schedule Risk Scanner Agent
Beyond P6: The Cost of Standing Still
P6 Set the Standard. We're Raising It.
Planera Accelerates Data Center Momentum as Hyperscale AI Boom Overwhelms Legacy Construction Scheduling Tools
What Is Percent Plan Complete in Construction and How Does It Work?
How to Build a Reliable Weekly Work Plan for a Construction Project
Why Data Center Construction Projects Fall Behind Schedule and Delays Happen
A Step-by-Step Guide on How to Update a Construction CPM Schedule
Why Near-Critical Paths Matter in Construction Project Scheduling
How to Build a Resource-Loaded Construction Schedule: Complete Guide
De-Risk the Supply Chain, Keep Procurement on the Critical Path
Protecting the Pro Forma: Why Owners Need Direct Eyes on the Capital Improvement Schedule
The Complete Guide to Data Center Construction From Planning to Turnover
How Long Does Data Center Construction Take? Timeline, Phases, and Challenges
AI Agents for Construction: Use Cases, Benefits and Examples
6 Best AI Construction Scheduling Tools in 2026
Legacy Tools 
Weren’t Built
for Data Center Construction
Planera Names Stephen Archibald Chief Financial Officer
How to Use AI in Construction: Practical Use Cases for Construction Teams
What's New in September
Five Takeaways from the Built for the AI Boom: Data Center Webinar
How to Conduct Delay Analysis for Construction Projects: Methods, Claims and Best Practices
De-Risking the Supply Chain: How Visual Sequencing Keeps Long-Lead Procurement on the Critical Path
What's New in Planera: July 2026
How to Develop a Commercial Construction Project Schedule
What's new in Planera: August 2026
How Construction Schedule of Values Helps Manage Project Costs and Payments
Construction Firms Face Autumn Microsoft Project Retirement Deadline
The Scheduler's Playbook
The Blueprint for Project Success: Why Collaborative Planning and AI are Redefining Construction Scheduling
How Construction Schedule Levels Improve Project Planning and Execution
Moving Beyond the Gantt Chart
Flipping the Construction Profit Equation
Making Schedules Accessible
How to Create a Construction Master Schedule and Manage a Project Timeline Successfully
Every Project You've Ever Seen Run Late Was Scheduled on Software from 2007
Construction Milestone Schedule: How to Plan Key Project Dates and Keep Projects on Track
The High Cost of Inaction: Why Sticking with Legacy Scheduling is Eroding Contractor Margins
What's new in Planera (June 2026): schedule changes with Manny, searchable notes, and more
Construction Fast Tracking: What It Is, When to Use It, and What Can Go Wrong
Lean Construction Scheduling: Principles, Techniques, and Benefits
Pull Planning in Construction: Process, Benefits, and Examples
Construction Sequence Plan: How to Sequence Work for Better Project Flow
9 Best Touchplan Alternatives for Construction Project Management in 2026
9 Best Outbuild Alternatives for Construction Project Management in 2026
Critical Path Method (CPM) in Construction: A Full Guide
What's New in Planera: May 2026
The Best Procore Alternatives for Construction Scheduling
Moving From
Legacy Tools to Modern CPM, the Complete Guide for Modern Construction Teams
Elevating Construction Success: The Planera Support Advantage
The Shift from Oracle P6 to Planera: Why Leading Contractors are Choosing Collaborative Scheduling
Lookahead Scheduling in Construction: How to Plan Without Slowing the Job Down
New AI Agent Changes Construction Scheduling..Are Schedulers Now Redundant?
Construction Scheduling 101: Complete How-to Guide for Project Managers [2026]
What's New in Planera: April 2026
Planera Releases AI Schedule Assistant; DPR Rolls Out ConstructivIQ on 120+ Projects
Planera Launches Manny, Turning Construction Schedules Into Live Decision Engines
Scheduling Without a Data Date Is Not Just Bad Practice, It's a Liability
Best Microsoft Project Alternatives in 2026 (Top Tools Compared)
July Product Updates: Better bulk actions, Hide collaborator cursors & more
August Product Updates: Four new features + a speed boost you’ll love
September Product Updates: Smarter Permissions, Sharper Insights, Richer Context
October Product Updates: New sorting for P6 imports, flexible IMS, edit-in-Gantt, and more
November Product Updates: Clearer navigation, smarter safeguards, and smoother interactions
December Product Updates: update schedules with confidence, investigate issues faster, and avoid cleanup work
Top 10 Oracle Primavera P6 Alternatives & Competitors for The Construction Industry in 2026
The MS Project Retirement: Why Construction Leaders are Securing Their Future with Planera
February 2026 Product Marketing Update
How to Read and Use a Gantt Chart for Construction Scheduling
Best Construction Workflow Management Software Picked for 2026
11 Best CPM Software of 2026 for Your Construction Project
Building Data Centers Faster and Smarter: Visual, Collaborative Scheduling Isn’t Just an Option—It’s a Business Mandate.
How Big-D Construction uses Planera to avoid ‘death by 1,000 paper cuts’
The Future of Construction Scheduling for GCs to Improve with AI using Planera
13 Best Construction Management Software Platforms to Compare in 2026
From Trailer to Tablet: Making Schedules Work Where the Work Happens
12 Digital Construction Tools Every Contractor Needs in 2026
50 Best Construction Scheduling Software Platforms in 2026
Change Leader: Why Infrastructure Projects Lose Margin Before They Break Ground
Planera Adds Industry Leaders Matt Burness and Mark Baracani to Strengthen Product and Construction Expertise
Planera Expands Data Centre Presence with New Funding
‍Planera Accelerates Data Center Expansion, Raises $8M in New Funding
Miles-McClellan Expands Scheduling with Planera for iPad
Planera September Update: Smarter Permissions, Sharper Insights, Richer Context
AMLI Residential Selects Planera to Transform Project Scheduling and Field Collaboration
The Future is Hybrid: Why Modern Construction Demands both CPM and Lean
The Evolution of Construction Scheduling in the Design-Build Era
Planera Featured on the Art of Construction Podcast
Report: Legacy Tools & Hiring Top Concerns Amid Construction Boom
Sticky Notes Don’t Scale: 5 Reasons to Choose Logic-Driven Scheduling
Drill Tech Selects Planera for Schedule-Critical Tunnel Projects
Scheduling That Keeps Up with Data Center Demands
Bridging the Skills Gap: PlaneraEDU Prepares Digital Jobsite Pros
Watch the Webinar! Planera Field Schedules Linked to Master Plan
Planera Wins 2025 Gold Globee® Award for Disruptors
Planera Launches Collaborative Field Scheduling for Teams
Planera CEO Nitin Bandhari Featured on ENR's Critical Path Podcast
Nitin Bhandari Wins Best Innovative Entrepreneur Award
Not a ‘Shiny Toy’: Contractor Overhauls Scheduling Without Hype
Planera Featured on Construction Conversations Podcast